AG Aspen Global Limited 886-4-2535-6441 [email protected] Green Energy, Offshore Wind Power, Substructure and Foundation, Special Steel Structures, Generator Turbines, Power Transmission and Distribution Systems, Solar Energy AG Aspen Global Limited 886-4-2535-6441 [email protected] Rolling Stock, MRT E&M, Whole Fleet of EMUs with High and Medium Capacity, LRT Light Rail Transit, High-Speed Rail E&M, ATC Auto Train Control, Bogie Mechanism AG Aspen Global Limited 886-4-2535-6441 [email protected] AI Artificial Intelligence, Robot Tools, Automation Equipment, Precision Tools (CNC), In-Mold Injection (IMD, IMR) AG Aspen Global Limited 886-4-2535-6441 [email protected] Reconstruction of A Large MD Insurance Policy System in USA, Package Insert of Well-Known Pharmaceutical Companies, Consent of Subjects AG Aspen Global Limited 886-4-2535-6441 [email protected] Interpretation for the Maintenance Training of Taiwan Air Force Aircraft, New Technical Orders for the Correction and Maintenance Manuals of Taiwan Military Equipment

LONG TERM PARTNERS

LONG TERM PARTNERS

分享到

LONG TERM PARTNERS

AGTraslation provides professional services with years for the following partner, and builds a  quality and reliability reputation with a long term partnership.

Partner

 (Representative Only)

--------------------------------------------------

 

German:

+ SIEMENS AG (TaiwanBranch, TS, and L&A Dept.)

+ TÜV

+ Hofftiff

....................

Japanese:

+ Marubeni

+ HITACHI

+ OMRON

+ Nippon Signal

+ Kawasaki

+ TOSHIBA

+ NATIONAL

....................

American:

+ Boeing, Rock Heed Marting

+ Harsco Track Technologies(HTT)

....................

France:

+ ALSTON

....................

Taiwan Domestic:

+ BOHSR (Bureau of HighSpeed Rail)

+ TRB (Taiwan Rail Burea)

+ DORTS (Department of RapidTransit Systems)

+ KMRT (Kaohsiung MassRapid Transit)

+ TRTC (Taipei Rapid TransitCorp.)

+ KRTC (Kaohsiung RapidTransit Corp.)

+ AIDC (Aerospace Industrial Development Corporation)

+ CTCI Corporation

+ ECOCA Industrial Co., Ltd.

+ Long Chang Machinery Co.Ltd.

+ Medigreen Biotech Corp.

+ Mercuries Data Systems Ltd.

+ Footwear & Recreation TTechnology Research Institute

+ Lee and Li Attorneys At Law

....................

 

Technical Documents Service

 (Oral Interpretation &Written Translation)

 ---------------------------------------------------

Tendering Doc., Proposals

+ Governmental Procurement Project Contract

+ Governmental Code, Stipulations

+ Construction Plan & Repoprt

+ Technical Specification of Tendering Project of E&M System

....................

+ Technical Specification of Grinder forDORTS

+ EMU Operation,  Operator, Maintenance,Training Materials & Manuals of Tamshui,Nankang, and Tucheng Line of Metro Taipei

+ Comm. System Operation, Maintenance,Training Materials & Manuals of Tamshui,Nankang, and Tucheng Line of Metro Taipei

Technical Specification of E&M System of Metro Kaohsiung

+ Technical Doc. of Turnouts, Switcher,Signalings

+ Commissioning Reports of Taiwan High Speed Rail (THSR) 

Technical Doc. of Air Con. System of THSR

+ Technical Doc. of CKS Airport MRT project

....................

+ Technical Doc. of Auto Ticket Issuing Machine

+ Quake Resistance Technical Data

Technical Doc. of Civil and Surveying Engineering

+ Testing Standards

+ Technical Literature of Fire Control, Civil Engineering,Quake Resistance

+ Optoelectronics Technical Doc.

Technical Doc. of Energy R&D

Programmable Logical Controller Technical Doc.

Scientific & Technical Yearbook and Thesis

+ Technical Doc. of Semiconductor, LCD,and TFT

+ Bio-Tech Technical Doc.

Patent Claims

+ Kokai (Japanese Unexamined Patent

   Publication)

....................

+ Quality Manual

+ Medical Regulation

+ Measuring Plan

+ Certification Code

+ Power of Attorney

+ Award of Arbitration

+ Notarization

+ Network and Relevant Data

+ Website Data

 

Engineering Consultant Service

 (Representative Only)

 -----------------------------------------

+ System Engineering Management

+ RAMS (Reliability, Availability,Maintainability, and Safety)System  Plan

+ Logistics Supporting Analysis

+ Life Cycle Cost Analysis

+ Testing Assessment

+ CMP (Configuration Management Plan)

+ Revenue & Maintenance Plan

+ FMECA (Failure Modes, Effects and Criticality Analysis) Report

....................